Annonces gratuites | Enchères en ligne | Appel d'offres | Emplois | Circulaires | Nos Hebdos | Interurbain | Rencontre en ligne | Weblocal
Le Messager LaSalle
Local News LaSalle
Envoyer ce texte à un ami Imprimer cette page Réagissez à cet article

Latour Bridge work to resume in spring

Pierre Boulanger par Pierre Boulanger
Voir tous les articles de Pierre Boulanger
Article mis en ligne le 9 janvier 2008 à 15:48
Soyez le premier à commenter cet article
Latour Bridge work to resume in spring
Latour Bridge work to resume in spring
As provided at the deadline, the reconstruction work for Latour Bridge has been suspended since Friday, December 21. This suspension will remain in effect during all of winter. The work will resume in spring 2008.

Half of the work for the eastern section of the bridge was completed on Saturday, December 15. Motorists going from north to south have already used this new lane.

For security reasons, access to LaSalle Hospital is via 43rd Avenue. Only emergency vehicles and delivery trucks can use the entrance that can be reached through Dollard Street (Champlain terrace). These instructions will remain in effect until the end of the reconstruction work which should be completed in the fall of 2008.

Ces articles pourraient également vous intéresser

Vos commentaires

Nom complet:
(requis)


Adresse courriel:


Vos commentaires :
(requis)


Svp inscrire le mot affiché ci-dessus Impossible de lire le mot?

Svp inscrire le mot affiché ci-dessus:


Chez nos voisins


La question du net

  • L'armée canadienne devrait-elle se retirer de l'Afghanistan?
  • Oui
  • Non

Liens