Annonces gratuites | Enchères en ligne | Appel d'offres | Emplois | Circulaires | Nos Hebdos | Interurbain | Rencontre en ligne | Weblocal
Le Messager LaSalle
Local News LaSalle
Envoyer ce texte à un ami Imprimer cette page Réagissez à cet article

Work begins on bridge span of 138

To pass over Monette Street

Pierre Boulanger par Pierre Boulanger
Voir tous les articles de Pierre Boulanger
Article mis en ligne le 17 avril 2008 à 12:08
Soyez le premier à commenter cet article
Work begins on bridge span of 138
To pass over Monette Street
The Transportation Minister will go ahead with the bracing work for the span bridge of 138 going headed towards Montreal, and will be passing over Monette Street. This structure is located at the axis of Honoré-Mercier Bridge and the work will require closing off Monette Street, between Stinson and Lafleur Avenue, starting this Sunday, April 20.

* There will be no infringement on the 138 resulting from the bracing work.

* Pedestrian pathways will be open at all times on Monette Street.

-* Drivers should take LaSalle Boulevard.

-* Buses can enter and leave to and from the Monette-Lafleur terminal via LaSalle Boulevard.

Ces articles pourraient également vous intéresser

Vos commentaires

Nom complet:
(requis)


Adresse courriel:


Vos commentaires :
(requis)


Svp inscrire le mot affiché ci-dessus Impossible de lire le mot?

Svp inscrire le mot affiché ci-dessus:


Chez nos voisins


La question du net

  • Suivrez-vous la soirée électorale du 8 décembre ?
  • Oui
  • Non

Liens